Documents » Sewer Lateral Inspection and Testing

This report will assist the Township in determining if the sewer lateral complies with regulations set forth by the Township’s Code of Ordinances. All testing and reports must be completed no more than thirty (30) days prior to the submission of this report.

Download a Sewer Lateral Inspection and Testing Report (PDF) »